Revitalization of a listed skyscraper

Installation of building services in a 12-story hotel

The former Commerzbank high-rise building in Düsseldorf's old town has been converted  into a modern city hotel. ENGIE Deutschland has taken over the installation of  the building equipment during this revitalization, based on a finished design. The project received a DGNB platinum certification. 

The listed building has a height of 12 floors  and a narrow location,  which required logistically demanding handling.

Customer benefits

Installation of building services systems from a single source
Experienced experts for the implementation of demanding construction projects

Our services

Heating

  • Local heat transfer station with 750 kW output,  cill convectors, underfloor convectors and radiators

 

Cooling

  • 3 refrigeration machines, total 435 kW

 

Sanitary facilities

  • 206 hotel rooms with bathrooms. Kitchen equipment for breakfast. Execution of drinking water technology incl. central water heating, sewage and rainwater technology

 

Fire-extinguishing system

  • Wall hydrant system with wet fire-extinguishing system including fire extinguishing separation station

 

Ventilation system technology

  • 2 ventilation systems Hotel rooms 12,960 m³/h, ground floor and lobby 11,060 m³/h, 4 small systems a total of 7,890 m³/h,  smoke pressure system for firefighters elevator and staircase 60,000 m³/h